2025 Road Improvements

2_2025-Local-Roads-Program-Map_Page_1SMALLER-(1).png

Kent County Road Commission 2025 Improvements
Location:
Various streets throughout the Township
Estimated Completion: Fall 2025
Funding Source: Funded by the Township General Fund and Kent County Road Commission

The Kent County Road Commission works with Township Staff to develop a road improvement plan each year and have have planned the following for 2025:

November 2025 Update: Due to initial road improvements for 2025 coming in under budget, the Township was able to add the following additional road repavement sections to the 2025 project.

  • Oak Terrace Ct: Woodbrook Dr to road end
  • Ridgemont Ct: Woodbrook Dr to road end
  • Sandy Ln Ct: Sandy Ln Dr to road end
  • Sandy Ln Dr: Woodbrook Dr to road end
  • Tricklewood Dr: Woodbrook Dr to Tricklewood Ct
  • Woodbrook Dr: Burger Dr to road end
The start date for milling is November 4th/5th, weather permitting.  Base course is scheduled to take place November 6th/7th, raise casting November 10th, and top course on November 11th/12th.

2025 Cascade Township KCRC Add-on Map
 

Bridge Rehab
Cascade Rd Bridge is now open.

48th-Bridge.jpg WhiteSquare.png
48th Street over Thornapple River  


Bridge Preventative Maintenance

TRD-Bridge.jpg 36th-Street-Bridge-_1.jpg
Thornapple River Drive over CSX Railroad 36th Street, 0.4-miles northwest of Thornapple River Drive
36th-Street-Bridge-_2.jpg
36th Street, 500-feet east of Kraft Avenue


Mill and Fill
28th Street – Kraft Avenue to Cascade Road

28th-Mill-and-Fill.jpg
 
Project Dates: 6/16/2025-6/27/2025
Conctractor: Michigan Paving and Materials

Emergency Numbers:
Road Work: 616-570-4059
Traffic Control: 616-570-4059

KCRC Personnel:
Sean McKean, Project Engineer
Maher Almunayr, On-Site Inspector

Scope of Work: Cold milling 28th Street to a depth of 2” and paving back with a fiber reinforced HMA mix followed by permanent pavement markings. This project will be completed while maintaining two-way traffic for the duration of project.
28th-Chip-Seal.jpg
 
Cherry,-45th-Chip-Seal.jpg Buttrick-Crush-and-Shape.jpg


For further questions related to Cascade roadwork, the Kent County Road Commission at (616) 242-6950 or Cascade Township Engineer Thorne at (616) 949-1500 or email him at athorne@cascadetwp.com.